How to Get Repair Quotes Inside a California Inspection Contingency

·6 min read·By Sawyer Stanley

The inspection report lands, your buyer wants to know what it all costs, and the contingency clock is already running. Contractors who could quote in a normal week may not be able to get out before your deadline. Here is how to get real numbers back in time.

Day 1: Sort the Report

Go through the report the day it arrives and pull out only the items that matter for negotiation: safety, structural, roof, electrical, plumbing, foundation, drainage, HVAC, and anything likely to cost more than a few thousand dollars. Group them by trade. That list, not the 60-page report, is what contractors need. If you are not sure how to read a report quickly, see how to read an inspection report.

Day 1–2: Send Clear Scopes to Several Contractors at Once

Calling one contractor at a time is how contingencies run out. Send the same written scope to two or three contractors per trade on the same day, and say up front when you need pricing back. A clear scope (what, where, how big) gets a faster and more comparable quote than "the inspector noted some roof issues."

When three or more trades are involved, send the whole list to a general contractor as one request instead of chasing each trade separately.

Day 2–5: Follow Up Daily

Most quotes that arrive late were simply not followed up. A short daily check-in keeps you near the top of a busy contractor's list.

Day 5–7: Build the Request

With real quotes in hand, you can decide item by item whether to ask for a repair, a credit or a price reduction. Quotes make the request credible and give the seller something concrete to agree to. For how to choose, see seller credits vs. repairs.

Let WorkOrder Run the Quotes

Upload the inspection report to WorkOrder and it pulls out the repair items, writes the scope in contractor language and estimates costs. Jamie, the WorkOrder Assistant, then reaches out to licensed local contractors, rolls multi-trade work up to a general contractor, and follows up so quotes come back inside your window.

Frequently Asked Questions

How long is the inspection contingency in California?

It is whatever the purchase agreement says. Offers commonly use somewhere between 7 and 17 days, and competitive offers often shorten it. Check the contract for the exact deadline and count calendar days unless it says otherwise.

Which inspection items should get contractor quotes?

Anything structural, roof, electrical, plumbing, foundation, drainage or HVAC, plus any single item likely to cost more than a few thousand dollars. Small cosmetic items rarely need a formal quote.

About the author

Sawyer Stanley

Founder of WorkOrder and a growth advisor to real estate and construction companies across California, with more than a decade in both industries as a general contractor and real estate investment specialist.

Ready to get started? Find licensed contractors in your area.

Get free quotes

Are you a contractor? Claim your market →